Kitchen extension and home office in Sinfin, Derby
A single-storey rear extension with a bigger kitchen on one side and a home office on the other, built under permitted development in 11–12 weeks.




A single-storey rear extension with two jobs to do: a dedicated home office on one side, and a bigger kitchen on the other. The customer paid an architect separately for the drawings, and we built it to that spec, all under permitted development.
What did we find when we dug the footings?
The footings are always the most unknown part of any extension, because you don’t know what’s down there until you dig. Here, there was a pipe running lengthways along the line of the footing. A pipe can pass through a footing if it’s protected, but it can’t run along inside one. So we dug up a bit more of the garden and re-routed the pipe so it crossed through the footing instead. Apart from that, it was a really smooth job.
How did they save on the steelwork?
Instead of knocking the whole back wall out, which would have needed one long, expensive steel, we kept a section of wall in the middle as a partition and made two separate openings, one into the office side and one into the kitchen side.
The roof is a lean-to, tiled to match the main house, with two rooflights bringing daylight deep into the kitchen, plus a white door and window onto the garden.
How the build went
- Footings. Dug out, the stray pipe re-routed, and the concrete poured.
- Walls. Built up against the house in a red brick picked to match.
- Two openings. The old back wall propped and opened up in two places, with the middle section kept as a partition.
- Roof and finish. Tiled lean-to with two rooflights, white windows and door, and the rooms made ready for the kitchen and office.
Read all reviews →“A fantastic job by DOT Services. Darcy is a fantastic, honest, thorough worker and we cannot recommend him enough.”
Other extension case studies
Thinking about your own extension?
Get a free, no-obligation quote. We don’t take a deposit, and the final payment is only due when the job is finished.